Workforce Requirement Analysis Using Workload Analysis with a Full-Time Equivalent (FTE) Approach in the Planning & Control Division of PT PLN (Persero) Pusharlis UP2W VI

Authors

  • Anditta Aurellia Avisa Universitas Pembangunan Nasional Veteran Jawa Timur
  • Moch Tutuk Safirin Universitas Pembangunan Nasional Veteran Jawa Timur

DOI:

https://doi.org/10.59934/jaiea.v5i2.2016

Keywords:

Workload; Full Time Equivalent (FTE); Workforce requirement; Work efficiency; PT PLN Pusharlis

Abstract

This research was conducted at PT PLN (Persero) Pusharlis Unit Pelaksana Pemeliharaan Wilayah VI (UP2W VI), focusing on the Planning and Control Division. This study aims to analyze the suitability between workload and the number of employees and to determine the ideal workforce requirement to improve operational effectiveness. The method applied is workload analysis using the Full Time Equivalent (FTE) approach through the calculation of task completion time and annual effective working hours. The results indicate differences in workload levels among teams, where some teams experience overload conditions, while others operate under near-optimal workload conditions. The application of the Full Time Equivalent (FTE) method provides a quantitative overview of actual workload conditions and serves as a basis for determining and adjusting optimal workforce formation to support work efficiency in the Planning and Control Division of PT PLN (Persero) Pusharlis UP2W VI

Downloads

Download data is not yet available.

References

P. P. T. Xyz, “FTE ( FULL TIME EQUIVALENT ) SEBAGAI,” pp. 433–443.

R. R. Cahyani, “Studi literatur : Analisis Beban Kerja Dengan Metode Full Time Equivalent ( FTE ),” vol. 13, no. 1, pp. 51–56, 2024.

M. N. Rasit and R. A. Hidayati, “Analisis Beban Kerja Karyawan di Departemen Produksi Menggunakan Metode Full Time Equivalent ( FTE ) PT . KLM,” vol. 6, no. 6, pp. 113–125, 2025.

F. T. Equivalent, S. Supervisor, J. Supervisor, K. Kunci, and F. T. Equivalent, “JITMI Vol . 5 Nomor 1 , Maret 2022 ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT ( FTE ) PADA FUNGSI RSD ( RECEIVING , STORAGE AND DISTRIBUTION ) DI PT . X Nur Fajriah , Santika Sari Program Studi Teknik Industri , Universitas Pembangunan Nasional Veteran Jakarta , Indonesia,” vol. 5, pp. 37–41, 2022.

V. Issue, R. W. Syahfitri, Y. Mauliddina, and G. Ranti, “JUTIN : Jurnal Teknik Industri Terintegrasi Penerapan Metode Full Time Equivalent ( FTE ) dalam Analisis Workload untuk Efisiensi Sumber Daya Manusia di Departemen Procurement PT . ABC,” vol. 8, no. 2, pp. 2067–2071, 2025.

E. Sulistyowati, F. Lukiastuti, and R. Retnosary, “Jurnal Magisma Vol. XIII No. 1 – Tahun 2025 | 66 Analisis Beban Kerja Dan Kebutuhan Sumber Daya Manusia Dalam Aktivitas Bisnis Supplier Buah Dan Sayur Cahaya Buah Semarang Menggunakan Metode Full Time Equivalent (FTE),” vol. XIII, no. 1, pp. 66–84, 2025.

M. Alamsyah and R. Anwar, “ANALISIS BEBAN KERJA KARYAWAN DENGAN METODE FULL TIME EQUIVALENT ( FTE ) PADA UNIT PEMUPUKAN PERKEBUNAN KELAPA,” vol. 27, no. 1, pp. 9–15, 2023, doi: 10.46984/sebatik.v27i1.2232.

K. Khotimah, T. Industri, F. Teknik, and U. M. Gresik, “No Title,” vol. 8, pp. 1534–1540, 2025.

F. R. Hidayat, “Analisis Jumlah Tenaga Kerja Optimal pada Proses Pengolahan Pisang Cavendish Guna Memenuhi Target Permintaan,” vol. 12, no. 1, pp. 303–311, 2025.

A. Yanto, W. Pasaribu, and P. Lumbanraja, “WORKLOAD ANALYSIS TO DETERMINE THE OPTIMAL NUMBER OF EMPLOYEES AFTER THE HOLDING-SUBHOLDING TRANSFORMATION IN THE BUSINESS SUPPORT DIVISION OF,” vol. 4, no. 10, pp. 3359–3392, 2025.

Downloads

Published

2026-02-15

How to Cite

Anditta Aurellia Avisa, & Moch Tutuk Safirin. (2026). Workforce Requirement Analysis Using Workload Analysis with a Full-Time Equivalent (FTE) Approach in the Planning & Control Division of PT PLN (Persero) Pusharlis UP2W VI. Journal of Artificial Intelligence and Engineering Applications (JAIEA), 5(2), 2793–2801. https://doi.org/10.59934/jaiea.v5i2.2016