Implementation of ISMO – Based Maintenance System for Shaker Machines at PT X
DOI:
https://doi.org/10.59934/jaiea.v5i2.2036Keywords:
Availability; Downtime; ISMO Method; Preventive Maintenance; Repair Complexity; Shaker Machine.Abstract
This study examines the implementation of the ISMO maintenance system (Inspection, Small Repair, Medium Repair, and Overhaul) for tobacco screening machines at PT X, located in East Java. The research compares the existing preventive maintenance approach with the ISMO method to evaluate differences in downtime and availability values. The screening machine, developed internally by PT X's engineering team, operates with vertical and horizontal movements to separate non-tobacco materials during processing. Using repair complexity analysis, the study determined the screening machine has a complexity value of 9 as a machine tool. Results indicate that the current company maintenance system achieves 99.86% availability with a total downtime of 580 minutes, whereas the ISMO method results in 97.89% availability with 8,856 minutes of downtime. The ISMO approach requires 3 workers for inspection, 8 for small repairs, 10 for medium repairs, and 11 for overhaul activities. While both methods show excellent availability above 95%, implementing ISMO significantly increases downtime, potentially causing production delays. This study provides a detailed classification of maintenance activities for each ISMO level, offering practical guidance for systematic machine maintenance implementation.
Downloads
References
M. I. Pasaribu et al., “ANALISIS PERAWATAN ( MAINTENANCE ) MESIN SCREW PRESS DI PABRIK KELAPA SAWIT DENGAN METODE FAILURE MODE AND,” vol. 9, no. 2, hal. 104–110, 2021.
A. Nugraha, R. Setiawan, dan D. Pratama, "Perancangan Sistem Manajemen Pemeliharaan Mesin Berbasis Computerized Maintenance Management System (CMMS) di Industri Manufaktur," Jurnal Teknik Industri, vol. 25, no. 2, hal. 167-176, 2020.
K. W. Wirakusuma, A. Pranata, P. Purba, dan K. Muhammad, “Pendekatan Metode ISMO Dalam Menyusun Penjadwalan Perawatan Gearbox dan Rantai Pe ngangkut Ore Departemen Circular Sintering PT . IRNC,” vol. 4, no. 1, hal. 10–18, 2023.
K. Pranata dan J. Saifudin, “Penerapan Sistem Perawatan Mesin Niagra Filter Menggunakan Metode Preventive Maintenance Dengan Klasifikasi ISMO di PT XYZ,” vol. 19, no. 2, hal. 218–229, 2024.
I. P. Saputra, N. K. Sari, dan M. Rizaldi, "Analisis Penerapan Preventive Maintenance dalam Meningkatkan Availability Mesin di Industri Tekstil," Jurnal Optimasi Sistem Industri, vol. 19, no. 2, hal. 112-120, 2021.
S. Winarto, “Artikel Perencanaan Perawatan Pompa Distribusi I pada Unit Water Treatment Plant Berdasarkan Metode Ismo,” 2023.
A. S. Purba, N. F. Pujo, N. Pamungkas, dan N. Yuniarsih, “Studi Pengaruh Nilai Availability Mesin Stamping Terhadap Jumlah Hasil Produksi,” vol. 16, no. 2, hal. 98–103, 2024.
R. Anugerah dan M. Puteri, “ANALISIS PENGARUH NILAI AVAILABILITY DAN WAKTU DOWNTIME TERHADAP PRODUKTIVITAS MESIN PADA AUTOMATIC AMPOULE FILLING DAN SEALING MACHINE DI PT . INDOFARMA , TBK,” no. November, hal. 1–4, 2014.
I. Murni, T. Ahmad, L. Asril, dan R. Novivanto, “ANALISIS PERFORMANCE BAND SERVICE MESIN ATB-I3 DENGAN PERHITUNGAN AVAILABILITY,” J. Sains Ilmu Teknol. Ind., vol. 4, no. 2, hal. 1–9, 2024.
G. Agusti, “Analisis Efisiensi Produktivitas Menggunakan Metode Overall Equipment Effectiveness Pada Industri Manufaktur Automotive Components di PT Kawasan Industri Modern Cikande Serang,” vol. 1, no. 2, hal. 2318–2343, 2025.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Journal of Artificial Intelligence and Engineering Applications (JAIEA)

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.








